PUBLISHED ON: 13 August 2020

News

  • M2 Headbox Replacement (Australian Paper)
  • Pipe Work – Supply, spooling, manufacture, installation and onsite pipe welding.
  • Mechanical installation – Headbox, Sole plates for Headbox within 0.01mm of manufacturing tolerance, Pumps & Valves.
  • Structural steelwork – Supply fabrication & erection.
  • Civil works – Shadbolt excavated and installed Headbox hold down anchors and sole plates to within OEMs requested tolerances.