“Thanks to Shadbolt Group for your efforts and the teams sent to site for the CFA Thermal Oxidiser installation. The quality and delivery of this project has been much appreciated.”
"Shadbolt Group successfully fabricated and installed a set of process piping at elevations over 20 metres high to close dimensional tolerances within the tight shut schedule, resulting in a very satisfactorily completed project all round."
"I was impressed by the work ethic, professionalism and results delivered by the Shadbolt Group team. Shadbolt Group joined HMAS Canberra at very short notice to conduct crop and renew work on the Forward Aircraft Elevator. From the time they joined, until the time they left, the Shadbolt team went out of their way to work with Canberra crew to achieve the full scope of repairs in the time frames set. The Navy would be nothing without industry partners like your team. I look forward to and encourage future engagement between LHD Canberra Engineering Division and the Shadbolt Group."